Commissioning
Safe, Tested and Operation-Ready Commissioning for Your Lifting Systems
We ensure that systems manufactured or modernized with Kalsys engineering are activated on site in compliance with international standards and ready for operation.
Commissioning a lifting system in accordance with its design parameters is just as critical as its installation. With its expert technical team, Kalsys manages the commissioning process through a comprehensive approach covering functional inspections, static/dynamic tests, safety calibrations, automation verification and user training.
Safe Performance from the Very First Movement
Our objective is to ensure that the system operates safely, under control and at maximum performance from the moment it is first started on site. Therefore, during commissioning we evaluate not only whether the equipment operates, but also its behavior under load, safety systems, braking performance, motion limits and operator operating conditions.
What Does Our Commissioning Process Cover?
Before putting your system into operation, we carry out the following critical steps in a controlled manner to support safe and sustainable operating performance.
Functional Tests
The operating limits of travel, lifting, lowering, rotation and motion mechanisms are checked both without load and under load, and the system is verified to operate in accordance with its design parameters.
Safety System Calibration
Limit switches, overload protection systems, load cell equipment, emergency-stop functions and anti-collision sensors are precisely adjusted and tested.
Speed Control & Drive Optimization
Drives and inverter systems are parameterized according to site conditions, load type and operating speed to achieve efficient and safe operation.
Communication & Automation Control
Remote controls, PLC systems, signaling, control panels and plant automation connections are verified to operate safely and compatibly on site.
Load Testing & Technical Verification
Load testing, one of the most critical stages of the commissioning process, is carried out carefully to verify the safe operating performance of the system on site. Through static and dynamic load tests, Kalsys evaluates the structural integrity, mechanical behavior and braking safety of the equipment.
Static Load Test
A static load test performed above the design capacity is used to verify the system's structural integrity, load-carrying safety and stability under load.
Dynamic Load Test
Dynamic tests are used to evaluate the safe and controlled operation of lifting, lowering, travel, braking and motion systems under load.
Technical Reporting
Findings, test results and conformity checks obtained during the commissioning and testing process are documented in technical reports.
Commissioning Process Steps
User Training & Safe Handover
At Kalsys, we deliver not only the equipment but also a culture of safe and sustainable operation. Within this scope, we provide the necessary information and training to help operators and maintenance teams use the system correctly, safely and efficiently.
Operator Training
Crane operators are instructed in safe operation, correct operating procedures, emergency steps and fundamental operational rules.
Maintenance Team Briefing
Key maintenance points, system warnings, periodic inspection requirements and important technical considerations are shared with maintenance teams.
Documentation
Operating manuals, technical drawings, test reports, conformity documents and all required documentation are delivered in full.
Let’s Prepare Your Systems for Safe Operation
Share your commissioning, load-testing and technical-reporting requirements with us for crane systems, spreader beam solutions, lifting equipment or modernized systems.
CREATE A COMMISSIONING REQUESTLET US PROVIDE THE SERVICE YOU NEED
KALSYS values quality and safety.